{"id":13572,"date":"2022-09-30T20:16:02","date_gmt":"2022-09-30T20:16:02","guid":{"rendered":"http:\/\/www.alurac.arucon.com\/arucon\/portfolio\/equinix-copy\/"},"modified":"2022-10-02T14:18:32","modified_gmt":"2022-10-02T14:18:32","slug":"mcer","status":"publish","type":"portfolio","link":"https:\/\/arucon.com\/portfolio\/mcer\/","title":{"rendered":"MCER"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t \t\t\t\t\t
\n\n\t\t\t\t\t\t\t
\n\t\t\t\t\tWarsaw Marki\t\t\t\t<\/div>\n\t\t\t\n\t\t\t
\n\t\t\t\t

MCER<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\n\t\t\t\t\t\t\t
\n\t\t\t\t\tWarsaw Marki\t\t\t\t<\/div>\n\t\t\t\n\t\t\t
\n\t\t\t\t

Education and Recreation Center (MCER)<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t
\n\t\t\t\t\t

The MCER has been designed to be a zero-energy building, in that it should consume as much energy each year as it produces. Currently the most modern educational and recreational complex in Poland.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\n\t\t
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\"stamp3\"\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t \t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\n\t\t\t\t
\n\t\t\t\t\t\n\t\t\t\t\t\n\t\t\t\t\t
\n\t\t\t\t\t\t

Project: Education and Recreation Center (MCER)<\/strong>
Location: Marki, Poland<\/strong>
Main contractor: Budimex
<\/i>Architect: -<\/i><\/strong>
Complete: 2019
Fa\u00e7ade Scope: <\/strong>Optimization of solutions in terms of cost reduction in the 15-year life cycle of the building, design of ventilation, heating and cooling, water and sewage, gas, as well as connections for water, sewage and gas. Demolition plan, building permit design and detailed construction design.<\/p>\n\t\t\t\t\t<\/div>\n\t\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t

\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t \t\t\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\n\t\t\t\t\tget in touch\t\t\t\t<\/span>\n\n\t\t\t\t\t\t\t<\/a>\n\t\t<\/div>\n\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\n\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\n\t\t\t\n\t\t\t
\n\t\t\t\t

SEND US A MESSAGE<\/h4> \n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\n
\n

<\/p>

    <\/ul><\/div>\n
    \n
    \n\n\n\n\n\n\n<\/div>\n
    \n\t

    \n\t